Click the wikilink to open the note or create a new note if it does not exist
View all referred links on the sidebar
The link title will update if the referred note title be modified
Fixed some bugs on the editor
Improved the empty state display
2.0.1
2020-11-21
(Desktop) New: Word count, Focus Mode, Typewriter Mode
Fixed editor bugs and improved the performance
2.0
2020-10-30
[New feature] Brand-new update of Markdown editor with more practical features
Improved user experience of editing
Optimized the color them of charts to adapt dark mode
1.6
2020-09-18
Fixed the purchase bug
1.5
2020-08-14
Improved: Now you could change the width of the tag list and note list by dragging
Fixed the image loading error when checking the note on the other device after synced
1.4.1
2020-08-05
Fixed the issue that can not cancel the selected status after selecting all content.
1.4
2020-08-03
New: Change window view by hotkeys:
Ctrl + 1: only show note content area
Ctrl + 2: hide the tag list and note list
Ctrl + 3: show all the section of the window
Click the icon or press Ctrl + click the link to visit the link
Left-click an image can activate the editing of the image, right-click the image, choose Change or Delete in the menu
Optimized the notification when can not upload notes
Fixed the issue that the math formula can not render when pasting some text which includes math formulas to Lite
Fixed the application freeze issue when input { in the Echart code
[Windows] Fixed the issue that the input method is shown in the wrong position
1.3
2020-07-27
New: In-app-purchase on macOS.
1.2
2020-07-24
New: Table of Contents
The panel could float or pin on the window, which makes the long article more comfortable to read or write
New: Menu of Table
Set the number of columns and rows by clicking the icon on the top left corner. Insert a row above or a column after support hotkey.
Copy table as markdown or HTML for pasting to multiple places.
New: Export as a markdown file
Fixed the bug that can not draw a User Journey Chart
Fixed the bug that can not resize the view after being zoom out
1.1
2020-07-17
New feature: Export as PDF
New feature: Export as Image
You could get the latest WizNote Lite on Microsoft Store or Mac App Store